Northline Services Pty Ltd expand_more
Sam MitchellSM
smartphone

Technician App

Clock-in → SWMS → tasks → gated clock-out. Exactly as the scope defines it.

Single Day Multi-Day · intermediate Multi-Day · final day
Today
Thu 9 Jul
JD J. Doyle Lead
Gutter reline — full replacement
Day 3 of 3 BKT-2026-1192 · CC-4488
location_on22 Marley Rd, Reservoir
schedule06:30–16:00
JDRP
with R. Patel · Second
11 tasks visible

Tasks are visible from the moment your schedule is visible — before clock-in.

1 · Today's schedule
arrow_back Clock in Thu 9 Jul · 06:26
location_on
near_meYou are 24 m from site — within range.
-37.7169, 145.0031 · ±5 m

Clock-in starts your timesheet.

2 · GPS clock-in
SWMS acknowledgement Thu 9 Jul · 06:31
health_and_safetyAfter clock-in the SWMS must be acknowledged before ANY other function.
Gutter SWMSv2
Working at Heights Excavation & Confined Space

1 · Base statement. All work is performed to the safe work method defined for gutter relining: site access controls, exclusion zones below the work area, and inspection of anchor points before use.

2 · Working at Heights. Harnesses inspected and worn above 2 m; edge protection or EWP in place; ladders footed and tied; no work on wet or wind-affected roof surfaces.

3 · Excavation & Confined Space. Services located before any ground disturbance; trenches over 1.5 m benched or shored; confined-space entry only with permit, atmosphere test and standby person.

PPE: hard hat, hi-vis, gloves, eye protection. Report all incidents and near-misses to the Manager immediately.

Records your name, timestamp, template version & sections — stored as a legal record. A NEW acknowledgement is required each day on multi-day bookings. Every technician (Lead AND Second) must acknowledge.

3 · SWMS — required before anything else
Tasks — Gutter reline Day 3 of 3
3/11 resolved
1
Strip remaining old guttering — west face
Complete
image
2
Install quad gutter & brackets — west face
Complete
3
Fit gutter guard — full perimeter
Incomplete
4
Flush test & photograph all outlets
Not Started photo_cameraPhoto required

Photo required to complete.

5
Site clean-up & waste removal
Not Started

Action in any order; marking Incomplete requires a reason; Second technicians never see this list.

4 · Task list (Lead only)
Clock out Day 3 of 3 — final
State A — tasks outstanding
warning2 tasks still Not Started

Every task must be Complete or Incomplete before clock-out on the FINAL day.

State B — all tasks resolved
All 11 tasks resolved

Intermediate days are NOT gated; Second technicians are never gated.

5 · Clock-out — gated (final day)
RP R. Patel Second Thu 9 Jul
Decline SWMS

Raises a Manager flag on the Managers Hub daily dashboard — does NOT block you from proceeding; the Manager follows up.

RP
R. Patel
Second technician
No task list shown Clock-out not gated SWMS still required

Seconds clock in, acknowledge the SWMS every day, and clock out — the task list and the final-day gate belong to the Lead only.

6 · Refusal + Second technician