Northline Services Pty Ltd expand_more
Sam MitchellSM
Booking Hub chevron_right Booking Buckets chevron_right Create Booking Bucket
add_circle

Create Booking Bucket

Job-first: every bucket links to a simPRO job and cost centre. Complete the five steps below — save as tentative at any point, or confirm once exactly one Lead is assigned.

1 Job & type
2 Technicians
3 Tasks
4 Skills & rate
5 Notes & confirm
1

Job & booking type

Draft · BKT-2026-1203
linksimPRO job required — buckets can only be created against an existing simPRO job — scheduling against quotes is not supported in this release.
simPRO Job Search * type ≥ 3 chars to search live simPRO jobs
Job Number simPRO
Cost Centre simPRO
Site Name simPRO
Job Address simPRO
Cost Centre Summary simPRO
Booking Type *
type cannot change after the booking is confirmed
Date leave blank to keep the booking Tentative — a Tentative booking can be saved with no date
Start / Finish
date_range
Multi-Day set-up — set the Total Days and designate the Final Day. The Final Day carries the Lead's clock-out validation; it is changeable until the booking is confirmed, and the booking type cannot change after confirmation.
Total Days
Final Day
2

Allocate technicians

Lead set
Available
JD
J. DoyleRoofing · Lead-capable
Heights ✓FasciaEWP
TR
T. RuizRoofing
Heights ✓Excavation ✓
RP
R. PatelRoofing · Apprentice
No HeightsGutters
MK
M. KaurBooked · CC-4490
Allocated

technicians already allocated to an overlapping slot are excluded automatically

Allocated to this booking
JD
J. DoyleRoofing · Lead-capable
RP
R. PatelRoofing · Apprentice

If no Lead is designated the bucket is flagged warningNo Lead set — currently cleared, because J. Doyle is set as Lead.

verified_userExactly ONE Lead is required — the system will not confirm a booking with no Lead or two Leads. A technician cannot be double-booked for the same time slot.
3

Assign tasks

6 tasks · 3 photo-required
From task groups

Fascia and Gutter

6 tasks

Set up access & exclusion zone · Remove existing gutter runs · Inspect & replace damaged fascia boards · Install fascia cover & gutter brackets · Hang gutter & fit downpipes · Flow test, clean & waste away

Roof Safety Check

3 tasks

Anchor point integrity check · Harness & lanyard inspection · Perimeter edge protection check

Individual templates
Task templates Booking
Downpipe flow test ✕ Debris chute set-up ✕
selected templates are appended to the booking task list below
One-off task
Task name
Description
Photo required
 

Booking task list (ordered)
drag_indicator1
Set up access & exclusion zone
EWP / ladder positioned, signage and bunting per SWMS.
photo_cameraPhoto required
drag_indicator2
Remove existing gutter runs
Strip old gutter and brackets; stack for waste run.
drag_indicator3
Inspect & replace damaged fascia boards
Probe for rot; replace like-for-like, prime cut ends.
photo_cameraPhoto required
drag_indicator4
Install fascia cover & gutter brackets
Brackets at 600 mm centres; fall towards downpipes.
drag_indicator5
Hang gutter & fit downpipes
Silicone joints, pop rivets, reconnect downpipe runs.
drag_indicator6
Flow test, site clean & waste away
Hose test all runs; leave strata common area clear.
photo_cameraPhoto required

The Lead sees tasks in this sequence but can action them in any order; Second technicians are not shown the task list; photo-required tasks cannot be completed without a photo.

4

Required skills & rate

Required Skills Booking
Working at Heights ✕ Fascia ✕
drives the available-technician filter — options come from the central Skills list
Rate Type used for simPRO rate multiplying — separate from Booking Status
Total Hours Needed scheduler estimate
5

Notes & confirm

Important Job Notes simPRO shared across ALL buckets for this job number — updates propagate in real time
Current Booking Notes Booking Text Blaze compatible — specific to this bucket
Booking Stage

Summary
J-20418 · Preston strata — fascia & gutter renewal BKT-2026-1203 (draft) · CC-4471 · Rosslyn Court Strata SP-2210
Single Day event Mon 6 Jul 2026 · 07:00–15:00
JDJ. DoyleLead RPR. PatelSecond
checklist 6 tasks · 3 photo-required Working at Heights Fascia payments Standard rate · 16.0 h
confirmation is blocked until exactly one Lead is assigned