Northline Services Pty Ltd expand_more
Sam MitchellSM
Booking Hub chevron_right Booking Buckets chevron_right Multi-Day · BKT-2026-1189
date_range

Gutter reline — full replacement

BKT-2026-1189 (parent) · CC-4488
Multi-Day · 3 days Confirmed Final: Thu 9 Jul
Day 1 of 3BKT-2026-1190
Tue 7 Jul
06:30–16:00 J. Doyle (Lead) + T. Ruiz (Second) 21.5 h clocked Complete · timesheet approved
Day 2 of 3BKT-2026-1191
Wed 8 Jul
06:30–16:00 J. Doyle (Lead) + T. Ruiz (Second) 21.5 h scheduled In progress · timesheet pending
Day 3 of 3BKT-2026-1192
Thu 9 Jul
06:30–16:00 M. Kaur (Lead · leave cover) + T. Ruiz (Second) 21.0 h scheduled Scheduled Final Day — clock-out validation active
infoIntermediate days have NO clock-out validation and their timesheets are approved at the end of each day; only the Final Day gates the Lead's clock-out.
account_treeNotes, Booking Stage, the task list, status, Further Action and Invoice Status live on the PARENT only — daily buckets never carry their own.

Parent booking — job-level record

simPRO Bookings Manager Accounts

Cannot change after the booking is confirmed.

Drives the Day X of Y indicator on every daily bucket.

Set by the Bookings team at creation; editable until confirmed; determines the clock-out validation day.

Held on the Parent only.

From simPRO — computed
Notes & history — Parent only, shared across all days

Real-time shared — instantly visible to office and technician app on every day of the booking.

Structured with the Text Blaze template.

Wed 8 Jul 2026 · 07:41
S. Mitchell — Bookings
Crane lift confirmed for 07:30; exclusion zone signage arranged with body corporate.
Mon 6 Jul 2026 · 15:10
A. Whitfield — Bookings
M. Kaur assigned Lead for Day 3 — J. Doyle on approved leave Thu. Skills re-validated.
Mon 29 Jun 2026 · 14:22
A. Whitfield — Bookings
Booking created — 3 consecutive days confirmed with body corporate; task list attached from library.
Requirements & rates
Working at Heights ✓Excavation ✓

The availability pool is filtered by these skills for every day — including replacement technicians.

Across all days.

Record stamps — computed
Day 1 of 3 Tue 7 Jul BKT-2026-1190
JDTR
06:30–16:00 · 21.5 h Complete Day 1 approved expand_more

Includes travel & yard loading.

JDJ. DoyleLead TRT. RuizSecond

A different Lead/Second can be assigned across days to cover leave.

Written by clock in/out from the technician app; feeds this day's timesheet.

None recorded
TechnicianTimestampVersionStatus
J. DoyleTue 7 Jul · 06:35v2Acknowledged
T. RuizTue 7 Jul · 06:38v2Acknowledged

A NEW acknowledgement is required on each day — Day 1 acks do not carry to Day 2.

Day 2 of 3 Wed 8 Jul BKT-2026-1191
JDTR
06:30–16:00 · 21.5 h In progress Day 2 pending expand_less

Includes travel & yard loading.

JDJ. DoyleLead TRT. RuizSecond

A different Lead/Second can be assigned across days to cover leave.

Written by clock in/out from the technician app; feeds this day's timesheet.

gpp_maybeR. Patel declined 07:04 — site access unsafe

Flagged to Managers Hub · R. Patel (extra labour) reassigned off site after refusal.

TechnicianTimestampVersionStatus
J. DoyleWed 8 Jul · 06:39v2Acknowledged
T. RuizWed 8 Jul · 06:41v2Acknowledged
R. PatelWed 8 Jul · 07:04v2Refused

A NEW acknowledgement is required on each day — yesterday's acks do not carry over.

Day 3 of 3 Thu 9 Jul BKT-2026-1192
MKTR
06:30–16:00 · 21.0 h Final day Day 3 — not started expand_more

Includes travel & yard loading.

MKM. KaurLeadleave cover — J. Doyle on leave Thu TRT. RuizSecond

A different Lead/Second can be assigned across days to cover leave — skills re-validated on swap.

Final Day — the Lead's clock-out is blocked until tasks, notes and call-around fields are addressed.

None recorded
TechnicianTimestampVersionStatus
M. Kaurv2Required · due Thu 06:30
T. Ruizv2Required · due Thu 06:30

A NEW acknowledgement is required on each day — including the incoming leave-cover Lead.

7 / 11 complete Outstanding: 4
checklistThe task list lives on the Parent and is SHARED across all daily buckets — progress accumulates; a task completed on Day 1 stays complete on Day 2+.
1
Site induction, setup & exclusion zones
Induct with building manager, barricade drop zone, signage to AS 1319.
Complete · Day 1T. Ruiz · Tue 07:05
2
Install roof anchor points & static lines
Certified anchors at 8 points per layout drawing; tag and log serials.
Complete · Day 1photo_cameraPhoto requiredimageimageJ. Doyle · Tue 08:40
3
Strip existing box gutter — north run
Remove 42 lm existing gutter, de-nail, stack for waste pickup.
Complete · Day 1photo_cameraPhoto requiredimageT. Ruiz · Tue 13:20
4
Remove & dispose 6 sumps + 4 rainheads
Cut out, cap penetrations overnight, waste to skip.
Complete · Day 1J. Doyle · Tue 15:35
5
Crane lift — new gutter sections to roof
07:30 lift window; dogman on drop zone; confirm exclusion signage.
Complete · Day 2photo_cameraPhoto requiredimageJ. Doyle · Wed 08:15
6
Fit & fix new gutter — north run
42 lm Colorbond Monument; fall to sumps 1:200 minimum.
Complete · Day 2photo_cameraPhoto requiredimageT. Ruiz · Wed 12:50
7
Fit new sumps & overflow outlets
6 sumps with leaf guards; overflows to AS 3500.3.
Complete · Day 2J. Doyle · Wed 14:30
8
Fit & seal gutter — south run tie-in
42 lm south run; silicone all laps and tie into north run.
Incomplete · Day 2Reason: material short — 2 lengths Colorbond Monument due on site Thu 06:30; carries forward to Day 3.
9
Fit 4 rainheads & reconnect downpipes
Custom rainheads per fabrication drawings; swivel joints at downpipes.
Not started
10
Flood test all runs & photo evidence
Hose test each sump 10 min; photograph outlets running clear.
Not startedphoto_cameraPhoto required
11
Site clean, waste off & client walkthrough
Magnet sweep, skip collected, walkthrough with building manager.
Not started

SWMS acknowledgements — every technician, every day

DayTechnicianTimestampTemplateSectionsOutcome
Day 1J. DoyleTue 7 Jul · 06:35Gutter SWMS v214 / 14 readAcknowledged
Day 1T. RuizTue 7 Jul · 06:38Gutter SWMS v214 / 14 readAcknowledged
Day 2J. DoyleWed 8 Jul · 06:39Gutter SWMS v214 / 14 readAcknowledged
Day 2T. RuizWed 8 Jul · 06:41Gutter SWMS v214 / 14 readAcknowledged
Day 2R. PatelWed 8 Jul · 07:04Gutter SWMS v23 / 14 readRefused — reason recorded, Manager flagged
Day 3M. Kaur— due Thu 06:30Gutter SWMS v2Required — new ack each day
Day 3T. Ruiz— due Thu 06:30Gutter SWMS v2Required — new ack each day
health_and_safetyA NEW acknowledgement is required from every technician on every day of a Multi-Day booking — stored against that day's Daily Bucket, retrievable as legal records.
callCall-around review (tasks, status, Further Action, Invoice) is assessed ONCE at the end of the FINAL DAY — not on intermediate days. One invoice assessment covers the entire multi-day job.

Example below shows the final-day assessment as the Manager records it on Thu 9 Jul.

Final-day call-around — BKT-2026-1189

ManagerAccounts

Assessed once — covers all 3 days of the job.

Only when Booking Status = Incomplete.

Yes — variation raised No

Required when actual hours exceed estimate.

4.0 h over estimate across the 3 days.

Completed with Lead — M. Kaur, Thu 16:20
Audit links reviewed across all 3 daily buckets

Any reschedule option fires a notification to the Bookings team's Pending queue with outstanding tasks attached.

Invoice number required when Complete.

One invoice covers the whole multi-day job.

P. Nolan · Thu 9 Jul · 17:05

A. Whitfield · Fri 10 Jul · 08:15

A. Whitfield · Fri 10 Jul · 08:16

event_busyMid-job cancellation: if a middle day must be cancelled, the Parent is shortened to the completed days and a NEW booking is created for the remaining work with outstanding tasks carried forward.

Audits

Audit Result: Pass

Audit links attach to each DAILY bucket — the Parent aggregates all of them.

Audit Checked — verified at the final-day call-around · P. Nolan, Thu 9 Jul

Financials (simPRO computed)

simPRO
Estimated Hours60.0
Over Hours4.0 charged as variation
Over Hours Reason
POs Total$4,180 · 3 POs
POs Cost Centre$3,420 · CC-4488
Invoice %100% · INV-8841
Assets Assigned2 · EWP-07 boom lift, TRL-03 trailer

Hour totals include scheduled (future) hours from days not yet worked — figures keep moving until the Final Day closes out.