06:30–16:00J. Doyle (Lead) + T. Ruiz (Second)21.5 h clockedComplete · timesheet approved
Day 2 of 3BKT-2026-1191
Wed 8 Jul
06:30–16:00J. Doyle (Lead) + T. Ruiz (Second)21.5 h scheduledIn progress · timesheet pending
Day 3 of 3BKT-2026-1192
Thu 9 Jul
06:30–16:00M. Kaur (Lead · leave cover) + T. Ruiz (Second)21.0 h scheduledScheduledFinal Day — clock-out validation active
infoIntermediate days have NO clock-out validation and their timesheets are approved at the end of each day; only the Final Day gates the Lead's clock-out.
account_treeNotes, Booking Stage, the task list, status, Further Action and Invoice Status live on the PARENT only — daily buckets never carry their own.
Parent booking — job-level record
simPROBookingsManagerAccounts
Cannot change after the booking is confirmed.
Drives the Day X of Y indicator on every daily bucket.
Set by the Bookings team at creation; editable until confirmed; determines the clock-out validation day.
Held on the Parent only.
From simPRO — computed
Notes & history — Parent only, shared across all days
Real-time shared — instantly visible to office and technician app on every day of the booking.
Structured with the Text Blaze template.
Wed 8 Jul 2026 · 07:41
S. Mitchell — Bookings
Crane lift confirmed for 07:30; exclusion zone signage arranged with body corporate.
Mon 6 Jul 2026 · 15:10
A. Whitfield — Bookings
M. Kaur assigned Lead for Day 3 — J. Doyle on approved leave Thu. Skills re-validated.
Mon 29 Jun 2026 · 14:22
A. Whitfield — Bookings
Booking created — 3 consecutive days confirmed with body corporate; task list attached from library.
Requirements & rates
Working at Heights ✓Excavation ✓
The availability pool is filtered by these skills for every day — including replacement technicians.
A different Lead/Second can be assigned across days to cover leave.
Written by clock in/out from the technician app; feeds this day's timesheet.
None recorded
Technician
Timestamp
Version
Status
J. Doyle
Tue 7 Jul · 06:35
v2
Acknowledged
T. Ruiz
Tue 7 Jul · 06:38
v2
Acknowledged
A NEW acknowledgement is required on each day — Day 1 acks do not carry to Day 2.
Day 2 of 3Wed 8 JulBKT-2026-1191
JDTR
06:30–16:00 · 21.5 hIn progressDay 2 pendingexpand_less
Includes travel & yard loading.
JDJ. DoyleLeadTRT. RuizSecond
A different Lead/Second can be assigned across days to cover leave.
Written by clock in/out from the technician app; feeds this day's timesheet.
gpp_maybeR. Patel declined 07:04 — site access unsafe
Flagged to Managers Hub · R. Patel (extra labour) reassigned off site after refusal.
Technician
Timestamp
Version
Status
J. Doyle
Wed 8 Jul · 06:39
v2
Acknowledged
T. Ruiz
Wed 8 Jul · 06:41
v2
Acknowledged
R. Patel
Wed 8 Jul · 07:04
v2
Refused
A NEW acknowledgement is required on each day — yesterday's acks do not carry over.
Day 3 of 3Thu 9 JulBKT-2026-1192
MKTR
06:30–16:00 · 21.0 hFinal dayDay 3 — not startedexpand_more
Includes travel & yard loading.
MKM. KaurLeadleave cover — J. Doyle on leave ThuTRT. RuizSecond
A different Lead/Second can be assigned across days to cover leave — skills re-validated on swap.
Final Day — the Lead's clock-out is blocked until tasks, notes and call-around fields are addressed.
None recorded
Technician
Timestamp
Version
Status
M. Kaur
—
v2
Required · due Thu 06:30
T. Ruiz
—
v2
Required · due Thu 06:30
A NEW acknowledgement is required on each day — including the incoming leave-cover Lead.
7 / 11 completeOutstanding: 4
checklistThe task list lives on the Parent and is SHARED across all daily buckets — progress accumulates; a task completed on Day 1 stays complete on Day 2+.
1
Site induction, setup & exclusion zones
Induct with building manager, barricade drop zone, signage to AS 1319.
Complete · Day 1T. Ruiz · Tue 07:05
2
Install roof anchor points & static lines
Certified anchors at 8 points per layout drawing; tag and log serials.
Complete · Day 1photo_cameraPhoto requiredimageimageJ. Doyle · Tue 08:40
3
Strip existing box gutter — north run
Remove 42 lm existing gutter, de-nail, stack for waste pickup.
Complete · Day 1photo_cameraPhoto requiredimageT. Ruiz · Tue 13:20
4
Remove & dispose 6 sumps + 4 rainheads
Cut out, cap penetrations overnight, waste to skip.
Complete · Day 1J. Doyle · Tue 15:35
5
Crane lift — new gutter sections to roof
07:30 lift window; dogman on drop zone; confirm exclusion signage.
Complete · Day 2photo_cameraPhoto requiredimageJ. Doyle · Wed 08:15
6
Fit & fix new gutter — north run
42 lm Colorbond Monument; fall to sumps 1:200 minimum.
Complete · Day 2photo_cameraPhoto requiredimageT. Ruiz · Wed 12:50
7
Fit new sumps & overflow outlets
6 sumps with leaf guards; overflows to AS 3500.3.
Complete · Day 2J. Doyle · Wed 14:30
8
Fit & seal gutter — south run tie-in
42 lm south run; silicone all laps and tie into north run.
Incomplete · Day 2Reason: material short — 2 lengths Colorbond Monument due on site Thu 06:30; carries forward to Day 3.
9
Fit 4 rainheads & reconnect downpipes
Custom rainheads per fabrication drawings; swivel joints at downpipes.
Not started
10
Flood test all runs & photo evidence
Hose test each sump 10 min; photograph outlets running clear.
Not startedphoto_cameraPhoto required
11
Site clean, waste off & client walkthrough
Magnet sweep, skip collected, walkthrough with building manager.
Not started
SWMS acknowledgements — every technician, every day
Day
Technician
Timestamp
Template
Sections
Outcome
Day 1
J. Doyle
Tue 7 Jul · 06:35
Gutter SWMS v2
14 / 14 read
Acknowledged
Day 1
T. Ruiz
Tue 7 Jul · 06:38
Gutter SWMS v2
14 / 14 read
Acknowledged
Day 2
J. Doyle
Wed 8 Jul · 06:39
Gutter SWMS v2
14 / 14 read
Acknowledged
Day 2
T. Ruiz
Wed 8 Jul · 06:41
Gutter SWMS v2
14 / 14 read
Acknowledged
Day 2
R. Patel
Wed 8 Jul · 07:04
Gutter SWMS v2
3 / 14 read
Refused — reason recorded, Manager flagged
Day 3
M. Kaur
— due Thu 06:30
Gutter SWMS v2
—
Required — new ack each day
Day 3
T. Ruiz
— due Thu 06:30
Gutter SWMS v2
—
Required — new ack each day
health_and_safetyA NEW acknowledgement is required from every technician on every day of a Multi-Day booking — stored against that day's Daily Bucket, retrievable as legal records.
callCall-around review (tasks, status, Further Action, Invoice) is assessed ONCE at the end of the FINAL DAY — not on intermediate days. One invoice assessment covers the entire multi-day job.
Example below shows the final-day assessment as the Manager records it on Thu 9 Jul.
Final-day call-around — BKT-2026-1189
ManagerAccounts
Assessed once — covers all 3 days of the job.
Only when Booking Status = Incomplete.
Yes — variation raised No
Required when actual hours exceed estimate.
4.0 h over estimate across the 3 days.
Completed with Lead — M. Kaur, Thu 16:20
Audit links reviewed across all 3 daily buckets
Any reschedule option fires a notification to the Bookings team's Pending queue with outstanding tasks attached.
Invoice number required when Complete.
One invoice covers the whole multi-day job.
P. Nolan · Thu 9 Jul · 17:05
A. Whitfield · Fri 10 Jul · 08:15
A. Whitfield · Fri 10 Jul · 08:16
event_busyMid-job cancellation: if a middle day must be cancelled, the Parent is shortened to the completed days and a NEW booking is created for the remaining work with outstanding tasks carried forward.
Audits
Audit Result: Pass
Audit links attach to each DAILY bucket — the Parent aggregates all of them.