Northline Services Pty Ltd expand_more
Sam MitchellSM
health_and_safety

SWMS Templates (Admin Settings)

Site-specific safety forms, auto-selected by Cost Centre, version-controlled, stored as legal records.

description
Templates
5
Roofing · Gutter · Electrical +2
account_tree
Cost centres mapped
12
Auto-selects template per booking
verified
Acknowledgements this week
46
Signed after clock-in · legal records
gpp_maybe
Refusals this week
1
Flagged to Managers Hub

SWMS template library

5 templates · all active
Template nameVersionBase sectionConditional sectionsMapped cost centresLast updatedActions
Roofing SWMS
After-clock-in acknowledgement · Roofing team
v3
All technicians must complete a site-specific hazard assessment before commencing work…
Working at Heights
4 12 Jun 2026
Gutter SWMS
After-clock-in acknowledgement · Roofing team
v2
Ladder placement must be inspected and footed on stable, level ground before ascent…
Working at HeightsExcavation & Confined Space
3 28 Apr 2026
Electrical SWMS
After-clock-in acknowledgement · Electrical works
v4
Supply must be proven de-energised before any conductor or terminal is touched…
Electrical Isolation
2 19 May 2026
Excavation SWMS
After-clock-in acknowledgement · Groundworks
v1
Underground services must be located and marked before ground is broken…
Excavation & Confined Space
1 02 Dec 2025
General Maintenance SWMS
After-clock-in acknowledgement · All teams
v2
PPE as per site induction; housekeeping maintained throughout the works at all times…
— base section only 2 15 Jan 2026

Template editor — Roofing SWMS

Active
v3

Saving changes increments the version — historical acknowledgements keep the version they signed and are NEVER altered.

Conditional sections
Working at Heights mapped via Cost Centre
Excavation & Confined Space mapped via Cost Centre
Electrical Isolation mapped via Cost Centre
Saving increments to v4 — all future acknowledgements will reference v4; existing v3 records are untouched.
account_treeThis mapping auto-determines which SWMS template and which conditional sections a technician sees on any booking — no manual selection by the Bookings team or the technician.
Cost CentreCost centre nameTemplateConditional sections includedActions
CC-4471 Fascia & gutter repairs
Roofing SWMS
v3
Working at Heights
CC-4488 Gutter reline projects
Gutter SWMS
v2
Working at HeightsExcavation & Confined Space
CC-4462 Roof inspections
Roofing SWMS
v3
Working at Heights
CC-4490 Downpipes & general maintenance
General Maintenance SWMS
v2
— base section only
CC-4501 Skylights & electrical works
Electrical SWMS
v4
Electrical Isolation
CC-4455 Ridge & capping works
Roofing SWMS
v3
Working at Heights
Showing 6 of 12 mapped cost centres

Version history — Roofing SWMS

v312 Jun 2026current
S. Mitchell
Added harness anchor-point checks to the Working at Heights section.
v203 Feb 2026
P. Nolan
Added EWP (elevated work platform) section to base content.
v110 Oct 2025
S. Mitchell
Initial template created.

Acknowledgements always reference the version signed at the time — publishing a new version never rewrites a stored record.

BookingTechnicianDate / timeTemplate + versionSections includedOutcome
BKT-2026-1187
Fascia & gutter repair · CC-4471
JD J. Doyle
06 Jul 2026 · 07:02 Roofing SWMS · v3 Base + Working at Heights Acknowledged
BKT-2026-1187
Fascia & gutter repair · CC-4471
RP R. Patel
06 Jul 2026 · 07:05 Roofing SWMS · v3 Base + Working at Heights Acknowledged
BKT-2026-1190
Gutter reline · Day 1 of 3 · CC-4488
JD J. Doyle
01 Jul 2026 · 06:38 Gutter SWMS · v2 Base + Heights + Excavation & Confined Space Acknowledged
BKT-2026-1190
Gutter reline · Day 1 of 3 · CC-4488
TR T. Ruiz
01 Jul 2026 · 06:44 Gutter SWMS · v2 Base + Heights + Excavation & Confined Space Refused
Reason: site access unsafe — Manager flagged
BKT-2026-1191
Gutter reline · Day 2 of 3 · CC-4488
JD J. Doyle
02 Jul 2026 · 06:35 Gutter SWMS · v2 Base + Heights + Excavation & Confined Space Acknowledged
BKT-2026-1191
Gutter reline · Day 2 of 3 · CC-4488
TR T. Ruiz
02 Jul 2026 · 06:37 Gutter SWMS · v2 Base + Heights + Excavation & Confined Space Acknowledged
gavelOne record per technician per day. Records are retrievable at any time as legal documents; refusals raise a Manager flag but do not block the technician.